Skip to content

Prioritized labels 0

Drag to reorder prioritized labels and change their relative priority.

Labels 91

  • Instrument:SNS:BL4B
    sns-hfir-scse
  • Instrument:SNS:BL6
    sns-hfir-scse
  • Instrument:SNS:BL9
    sns-hfir-scse
  • IssueTypeCapability
    sns-hfir-scse
    A service that fulfills a stakeholder need
  • IssueTypeDefect
    sns-hfir-scse
    A change request that identifies a defect to be fixed
  • IssueTypeEnabler
    sns-hfir-scse
    An issue that is used to represent a large activity that is not directly related to a User Story or Defect
  • IssueTypeEpic
    sns-hfir-scse
    A large user story that has been broken down into multiple child user stories
  • IssueTypeStory
    sns-hfir-scse
    Short simple description of what a user wants from a piece of software in order to achieve some reason, generally a result of value. (Requirement Type)
  • IssueTypeTask
    sns-hfir-scse
    An Issue that is used to manage and track part or all of the implementation of a user story
  • Priority1-Blocking
    sns-hfir-scse
    Blocking tasks are the most urgent tasks that prevent data reduction for most or all users of one or more instruments. These tasks could include simple bugs that are quick to fix or the implementation of entirely new software to enable reduction for an instrument after an upgrade.
  • Priority2-Critical
    sns-hfir-scse
    Critical tasks are those that are severely affecting the ability of users to reduce data, but not yet preventing reduction. These tasks may, if left unfixed, become blocking tasks and cause strong drains on productivity. These tasks address capability gaps affecting many users.
  • Priority3-High
    sns-hfir-scse
    These tasks represent features that would greatly improve the performance of data reduction for one or more instruments, but the absence of the feature does not impact the majority of users. It is desirable for these tasks to be addressed above others.
  • Priority4-Medium
    sns-hfir-scse
    These tasks represent features or requirements that are needed, but their implementation can wait until blocking, critical, and high priority tasks have been addressed. These tasks may affect a small minority of users, and the needed capabilities may be available with a work around.
  • Priority5-Low
    sns-hfir-scse
    These tasks represent features or requirements that would be nice to have, but are not needed on a short time horizon. These tasks generally represent completely new capabilities and have no effect on today's users.
  • ReleaseDiff.2021
    sns-hfir-scse
    Major software release for Diffraction (SCD & PD) beyond PEMP