This project is mirrored from https://github.com/weaveworks/kured.git.
Pull mirroring failed .
Repository mirroring has been paused due to too many failed attempts. It can be resumed by a project maintainer or owner.
Last successful update .
Repository mirroring has been paused due to too many failed attempts. It can be resumed by a project maintainer or owner.
Last successful update .
- Jan 08, 2021
-
-
Daniel Holbach authored
Temporarily workaround alpine issue
-
Daniel Holbach authored
Corrected README Setting a schedule configuration example
-
jack-education authored
-
- Dec 14, 2020
-
-
Jean-Philippe Evrard authored
Until a new alpine image is created, we should ensure the latest packages are used, and therefore we should upgrade default installed packages. Without this patch, we'll have outdated and vulnerable packages until a new 3.12 image is released. This is a problem, as we'll publish broken images. This should temporarily workaround it, at the expense of larger images (contains package cache)
-
- Dec 09, 2020
-
-
Daniel Holbach authored
Fix comment spacing
-
Jean-Philippe Evrard authored
Without this patch, chart linting will fail: more than two spaces are needed before a comment in the helm chart values. This fixes it by adding one more space, and move the whole block of comments for consistency.
-
- Dec 07, 2020
-
-
Daniel Holbach authored
Publish image on tag with github actions
-
Jean-Philippe Evrard authored
As we are pretty much committed to github actions, we should probably rely on it to push the images at each commit merged on the master branch.
-
Jean-Philippe Evrard authored
This is to be on par with the previous documentation.
-
Ciaran Moran authored
-
Jean-Philippe Evrard authored
As we are pretty much committed to github actions, we should probably rely on it to push the images on tag. This covers the missing bits.
-
Daniel Holbach authored
Fix typo in github workflows
-
Jean-Philippe Evrard authored
Without this patch, the PR jobs are broken and no jobs are running. This was a recently introduced typo in the last refactor of the PR jobs. This should fix it, and make the PR test working again.
-
- Dec 05, 2020
-
-
Daniel Holbach authored
Merge pull request #220 from weaveworks/dependabot/go_modules/github.com/prometheus/client_golang-1.8.0 Bump github.com/prometheus/client_golang from 1.0.0 to 1.8.0
-
- Dec 02, 2020
-
-
Daniel Holbach authored
Force golang version
-
dependabot[bot] authored
Bumps [github.com/prometheus/client_golang](https://github.com/prometheus/client_golang) from 1.0.0 to 1.8.0. - [Release notes](https://github.com/prometheus/client_golang/releases) - [Changelog](https://github.com/prometheus/client_golang/blob/master/CHANGELOG.md) - [Commits](https://github.com/prometheus/client_golang/compare/v1.0.0...v1.8.0 ) Signed-off-by:
dependabot[bot] <support@github.com>
-
Daniel Holbach authored
Bump github.com/prometheus/common from 0.4.1 to 0.15.0
-
dependabot[bot] authored
Bumps [github.com/prometheus/common](https://github.com/prometheus/common) from 0.4.1 to 0.15.0. - [Release notes](https://github.com/prometheus/common/releases) - [Commits](https://github.com/prometheus/common/compare/v0.4.1...v0.15.0 ) Signed-off-by:
dependabot[bot] <support@github.com>
-
Daniel Holbach authored
Bump github.com/spf13/cobra from 1.0.0 to 1.1.1
-
dependabot[bot] authored
Bumps [github.com/spf13/cobra](https://github.com/spf13/cobra) from 1.0.0 to 1.1.1. - [Release notes](https://github.com/spf13/cobra/releases) - [Changelog](https://github.com/spf13/cobra/blob/master/CHANGELOG.md) - [Commits](https://github.com/spf13/cobra/compare/v1.0.0...v1.1.1 ) Signed-off-by:
dependabot[bot] <support@github.com>
-
Daniel Holbach authored
Bump github.com/sirupsen/logrus from 1.2.0 to 1.7.0
-
- Dec 01, 2020
-
-
Jean-Philippe Evrard authored
Without this, golang version used is the golang version decided by github. This is a problem, as it might shift over time, without our control. This fixes it by getting the golang version from the go.mod.
-
- Nov 30, 2020
-
-
dependabot[bot] authored
Bumps [github.com/sirupsen/logrus](https://github.com/sirupsen/logrus) from 1.2.0 to 1.7.0. - [Release notes](https://github.com/sirupsen/logrus/releases) - [Changelog](https://github.com/sirupsen/logrus/blob/master/CHANGELOG.md) - [Commits](https://github.com/sirupsen/logrus/compare/v1.2.0...v1.7.0 ) Signed-off-by:
dependabot[bot] <support@github.com>
-
Daniel Holbach authored
Do not bump kubernetes with dependabot
-
Daniel Holbach authored
Merge k8s and go updates
-
Jean-Philippe Evrard authored
Without this patch, we'll get kubernetes updates. This is not necessary, and could be even a problem on merge: those kubernetes updates are done separately, knowingly, to respect the life cycle of the kubernetes we need (and stay one version below latest to have a larger coverage of versions). We could keep dependabot to update those on a lower frequency, but that sounds clunky and not great. Instead disable them all, and rely on the team to do this regular maintenance work.
-
Daniel Holbach authored
Fix chart linter
-
Daniel Holbach authored
-
Daniel Holbach authored
-
Daniel Holbach authored
Merge remote-tracking branch 'upstream/dependabot/go_modules/k8s.io/apimachinery-0.19.2' into merge-k8s-and-go-updates
-
Daniel Holbach authored
Merge remote-tracking branch 'upstream/dependabot/go_modules/k8s.io/kubectl-0.19.4' into merge-k8s-and-go-updates
-
Jean-Philippe Evrard authored
There are lots of duplicated code in this workflow. This fixes it by making a unique job with parameters. The matrix buys us the parallelisation and the fail-fast.
-
Jean-Philippe Evrard authored
Without this patch, the lint action incorrectly returns everything is fine. This is a problem, as lint effectively is not running, and therefore we could merge broken charts. This fixes it by updating to the latest practices you can find in the official chart-repo-actions. (See the official example in ihttps://github.com/helm/charts-repo-actions-demo/blob/1a9640d9983d983404862daee9563fd871db3874/.github/workflows/lint-test.yaml)
-
Daniel Holbach authored
Bump nick-invision/retry from v1 to v2.2.0
-
dependabot[bot] authored
Bumps [nick-invision/retry](https://github.com/nick-invision/retry) from v1 to v2.2.0. - [Release notes](https://github.com/nick-invision/retry/releases) - [Changelog](https://github.com/nick-invision/retry/blob/master/.releaserc.js) - [Commits](https://github.com/nick-invision/retry/compare/v1...fb3bca3fb54f6488d7508c8d1eeb64b94efd5a93 ) Signed-off-by:
dependabot[bot] <support@github.com>
-
- Nov 27, 2020
-
-
Daniel Holbach authored
Cleanup github actions
-
Jean-Philippe Evrard authored
Without this, it's a little bit hard to grasp how things are interconnected. This should clarify things.
-
Jean-Philippe Evrard authored
- Made all the file extensions ".yaml" - Regrouped actions together to make it easy to see when they are useful: on-pr is useful at every PR, on-tag when we are ready to tag next image, on-pr-chart when we have a PR to modify the chart with the published image, on-release when we have released and need to publish the final helm chart - Regrouped periodic jobs together, to deal with stale prs/issues and ensuring that our helm chart always works.
-
Daniel Holbach authored
Add more logs into gates
-
Jean-Philippe Evrard authored
This will be necessary to find out why some docker containers fail to come back up in github actions.
-