Admins will be upgrading ORNL GitLab Servers on Saturday, 16 May 2026, from 7 AM until 11 AM EST. Repositories will experience intermittent outages during this time.
- The option `services.networking.networkmanager.enableFccUnlock` was removed in favor of `networking.networkmanager.fccUnlockScripts`, which allows specifying unlock scripts explicitly. The previous option simply did enable all unlock scripts bundled with ModemManager, which is risky, and didn't allow using vendor-provided unlock scripts at all.
- The `html-proofer` package has been updated from major version 3 to major version 5, which includes [breaking changes](https://github.com/gjtorikian/html-proofer/blob/v5.0.8/UPGRADING.md).
-`kratos` has been updated from 0.10.1 to the first stable version 1.0.0, please read the [0.10.1 to 0.11.0](https://github.com/ory/kratos/releases/tag/v0.11.0), [0.11.0 to 0.11.1](https://github.com/ory/kratos/releases/tag/v0.11.1), [0.11.1 to 0.13.0](https://github.com/ory/kratos/releases/tag/v0.13.0) and [0.13.0 to 1.0.0](https://github.com/ory/kratos/releases/tag/v1.0.0) upgrade guides. The most notable breaking change is the introduction of one-time passwords (`code`) and update of the default recovery strategy from `link` to `code`.