+1
−0
Loading
Admins will be upgrading ORNL GitLab Servers on Saturday, 16 May 2026, from 7 AM until 11 AM EST. Repositories will experience intermittent outages during this time.
This change runs Lix on the target commit and Nix on the merged commit. This does two things for us at once: - We test both Lix and Nix. - We ensure that both Lix and Nix produce the same output hashes. If Lix and Nix were to produce different output hashes at some point, this would show up as rebuilds in every PR.