+2
−0
Loading
Admins will be upgrading ORNL GitLab Servers on Saturday, 16 May 2026, from 7 AM until 11 AM EST. Repositories will experience intermittent outages during this time.
openssh tests are very slow (they take ~30 mins because they are not parallelized). This makes rebuilding (esp. after changes e.g. to systemd) painful. Putting the tests into a separate derivation solves this without losing any testing capability. Debian does the same: https://packages.debian.org/sid/openssh-tests